Job Description
Code Red Safety is looking several Field Safety Coordinators with construction and electrical experience for a large commercial construction project in the Dallas area. This project is already underway, and these safety roles will begin immediately. The work is expected to run for 3-6 months working 60+hrs/wk.
Applicants MUST meet the following requirements: - Have 3-5 years of construction safety experience
- Must have at least one of the following: OSHA 30, OSHA 510, OSHA 500, CSSS, CSST, CHST, CSHO or similar
- Experience with electrical safety and the NFPA 70E certification is preferred
- Have a valid FA/CPR card
- Must be able to pass a drug test & background check.
Code Red Safety specializes in placing qualified Safety Professionals into large industrial and commercial construction projects nationwide on a
1099 independent contract basis. If you meet the above qualifications and are interested in the position, please apply. If you are determined to be a good candidate for this project, we will be in touch to discuss additional details.
Job Tags
Contract work, Immediate start,